Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports 03/01/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 02/18/2016 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species 02/12/2016 Wetlands Download
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project 02/12/2016 Fish and Aquatics Download
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum 02/12/2016 Fish and Aquatics Download
Notification of Study Report Meeting, March 16, 2016 02/12/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources 02/04/2016 Terrestrial Download
Relicensing Study 3.2.2 Hydraulic Study Addendum 02/04/2016 Water Resources Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 02/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays 02/01/2016 Fish and Aquatics Download
FERC Letter Determination on Requests for Study Modifications and New Studies 01/15/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report 12/31/2015 Recreation and Land Use Download
Relicensing Study 3.6.5 Land Use Inventory Study Report 12/31/2015 Recreation and Land Use Download
FirstLight ​Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Updated Study Report and Meeting Summary 12/14/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Draft License Application Exhibit E 12/02/2015 Draft License Application Download
Draft License Application Cover Letter 12/02/2015 Draft License Application Download
Draft License Application Exhibit G 12/02/2015 Draft License Application Download
Draft License Application Exhibit C 12/02/2015 Draft License Application Download
Draft License Application Exhibit D 12/02/2015 Draft License Application Download
Draft License Application 12/02/2015 Draft License Application Download
Draft License Application Exhibit A 12/02/2015 Draft License Application Download
Draft License Application - Initial Statement and Additional Information 12/02/2015 Draft License Application Download
Draft License Application Exhibit H 12/02/2015 Draft License Application Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix A) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace 12/01/2015 Water Resources Download
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) 12/01/2015 Water Resources Download
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) 12/01/2015 Geology and Soils Download
Relicensing Study 3.7.2 Historic Architectural Resources Survey & National Register Evaluation Study Report Addendum 11/16/2015 Cultural Download
FirstLight submits requested survey data relating to Relicensing Study No. 3.6.3 Whitewater Boating Evaluation and Study No. 3.6.7 Recreation Study at Northfield Mountain, Including Assessment of Sufficiency of Trails For Shared Use 11/10/2015 Recreation and Land Use Download
FirstLight 2015 Updated Study Meeting Summary, held on 9/29/15-9/30/15 10/14/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
2015 Updated Study Report Presentation 09/28/2015 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species 09/14/2015 Wetlands Download
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study 09/14/2015 Fish and Aquatics Download
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.6.5 Land Use Inventory 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey 09/14/2015 Cultural Download
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use 09/14/2015 Recreation and Land Use Download
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation 09/14/2015 Cultural Download