Filing of Study Reports, Proposed Schedule, and Process Plan for Remaining Study Reports |
03/01/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Revised Study Plan 3.3.19 - Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace |
02/18/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment, and Assessment of Operational Impacts on Special-Status Species |
02/12/2016 |
Wetlands |
Download
|
Relicensing Study 3.3.4 Evaluate Upstream Passage of American Eel at the Turners Falls Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at the Northfield Mountain Pumped Storage Project |
02/12/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.18 Impacts of the Turners Falls Canal Drawdown on Fish Migration and Aquatic Organisms Addendum |
02/12/2016 |
Fish and Aquatics |
Download
|
Notification of Study Report Meeting, March 16, 2016 |
02/12/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.4.1 Baseline Study of Terrestrial Wildlife and Botanical Resources |
02/04/2016 |
Terrestrial |
Download
|
Relicensing Study 3.2.2 Hydraulic Study Addendum |
02/04/2016 |
Water Resources |
Download
|
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
02/01/2016 |
Fish and Aquatics |
Download
|
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays |
02/01/2016 |
Fish and Aquatics |
Download
|
FERC Letter Determination on Requests for Study Modifications and New Studies |
01/15/2016 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Relicensing Study 3.6.1 Recreation Use/User Contact Survey Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
Relicensing Study 3.6.5 Land Use Inventory Study Report |
12/31/2015 |
Recreation and Land Use |
Download
|
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Updated Study Report and Meeting Summary |
12/14/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Draft License Application Exhibit E |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Cover Letter |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit G |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit C |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit D |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit A |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application - Initial Statement and Additional Information |
12/02/2015 |
Draft License Application |
Download
|
Draft License Application Exhibit H |
12/02/2015 |
Draft License Application |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix A) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Water Surface) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Depth) |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace |
12/01/2015 |
Water Resources |
Download
|
Relicensing Study 3.3.9 Two-Dimensional Modeling of the Northfield Mountain Pumped Storage Intake/Tailrace Channel and Connecticut River Upstream and Downstream of the Intake/Tailrace (Appendix B Velocity) |
12/01/2015 |
Water Resources |
Download
|
Sediment Management Plan – Report of 2015 Activities for Northfield Mountain Pumped Storage Project (FERC No. 2485) |
12/01/2015 |
Geology and Soils |
Download
|
Relicensing Study 3.7.2 Historic Architectural Resources Survey & National Register Evaluation Study Report Addendum |
11/16/2015 |
Cultural |
Download
|
FirstLight submits requested survey data relating to Relicensing Study No. 3.6.3 Whitewater Boating Evaluation and Study No. 3.6.7 Recreation Study at Northfield Mountain, Including Assessment of Sufficiency of Trails For Shared Use |
11/10/2015 |
Recreation and Land Use |
Download
|
FirstLight 2015 Updated Study Meeting Summary, held on 9/29/15-9/30/15 |
10/14/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
2015 Updated Study Report Presentation |
09/28/2015 |
FERC Scoping/Integrated Licensing Process (ILP) Process |
Download
|
Updated Study Report Summary 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.1.2 Operation Impacts on Existing Erosion and Potential Bank Instability |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.5.1 Baseline Inventory of Wetland, Ripariam and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special-Status Species |
09/14/2015 |
Wetlands |
Download
|
Updated Study Report Summary 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of Northfield Mountain and Turner Falls Projects |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.3 Evaluate Downstream Passage of Juvenile American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.13 Impacts of the Turner Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.19 Evaluate the Use of an Ultrasound Array to Facilitate Upstream Movement of American Shad at Turner Falls |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.12 Evaluate Frequency and Impact of Emergency Water Control Gate Discharge Events and Bypass Flume Events on Shortnose Sturgeon Spawning and Rearing Habitat in the Tailrace and Downstream From Cabot Station |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.2 Evaluate Upstream and Downstream Passage of Adult American Shad |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.3.7 Fish Entrainment and Turbine Passage Mortality Study |
09/14/2015 |
Fish and Aquatics |
Download
|
Updated Study Report Summary 3.6.1 Recreational Use/User Contact Survey |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.6.5 Land Use Inventory |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.7.1 Phase IA (Reconnaissance) Archaeological Survey |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.6.6 Assessment of Effects of Project Operation on the Recreation and Land Use |
09/14/2015 |
Recreation and Land Use |
Download
|
Updated Study Report Summary 3.7.2 Historical Architechtural Resources Survey & National Register Evaluation |
09/14/2015 |
Cultural |
Download
|
Updated Study Report Summary 3.8.1 Evaluate the IMpact of Current and Proposed Future Modes of Operation on Flow, Water Elevation and Hydropower Generation |
09/14/2015 |
Operations |
Download
|