Licensing Documents

Filter

Document Title Date of Filing Contents Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (1/17/2017) 01/17/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Transmittal Letter FERC filing Study Reports 3.3.10 and 3.3.20 12/28/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Discuss Instream Flow Study (FirstLight Study No 3.3.1) Meeting Summary (12/2/2016) 12/02/2016 Fish and Aquatics Download
Relicensing Study 3.3.20 Ichthyoplankton Entrainment Assessment at Northfield Mountain Project -Second year 12/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.10 Assess Operational Impacts on Emergence of State-Listed Odonates in the Connecticut River 2014-2016 Study Report 12/01/2016 Fish and Aquatics Download
FirstLight Notification Letter providing revised FERC filing date for the Relicensing Study Report No. 3.1.2 Northfield Mountain/Turners Falls Operations Impacts on Existing Erosion and Potential Bank Instability Addendum 11/18/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Updated Study Report (URS) Study Meeting Summary (10/31/16 - 11/1/2016) 11/15/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Transmittal Letter filing 10 Study Reports, 3 Addenda and Agenda for Study Report Meetings Oct 31, 2016 and Nov 1, 2016 10/14/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects Addendum 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area (same report as posted 6/30/16) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.16 Habitat Suitability Criteria for State-listed Mussel Species in the Connecticut River below Cabot Station Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.2. Evaluate Upstream and Downstream Passage of Adult American Shad Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report (same report as posted 6/30/2016) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station (Appendix E) 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.7 Fish Entrainment and Turbine Passage Mortality Study 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.6.6 Assessment of Effects of Project Operation on Recreation and Land Use 10/01/2016 Recreation and Land Use Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume I (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.3.3 Evaluate Downstream Passage of Juvenile American Shad Interim Study Report 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.8 Computational Fluid Dynamics Modeling in the Vicinity of the Fishway Entrances and Powerhouse Forebays Addendum 10/01/2016 Fish and Aquatics Download
Relicensing Study 3.1.3 Northfield Mountain Pumped Storage Project Sediment Management Plan 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume III (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum - Public Version 10/01/2016 Wetlands Download
Relicensing Study 3.1.2 Northfield Mountain/Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report, Volume II (2016) 10/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (2016) 09/01/2016 Geology and Soils Download
Relicensing Study 3.3.13 Impacts of the Turners Falls Project and Northfield Mountain Project on Littoral Zone Fish Habitat and Spawning Habitat Study Report 06/30/2016 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Adult Sea Lamprey Spawning within the Turners Falls Project and Northfield Mountain Project Area 06/30/2016 Fish and Aquatics Download
FirstLight letter to FERC notifying study reports 3.3.13 and 3.3.15 uploaded to website 06/30/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report and Meeting Summary (5/31/2016) 05/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Final License Application Initial Statement and Additional Information 04/29/2016 Final License Application Download
Final License Application Exhibit G 04/29/2016 Final License Application Download
Final License Application Exhibit C 04/29/2016 Final License Application Download
Final License Application Exhibit A 04/29/2016 Final License Application Download
Final License Application Exhibit E 04/29/2016 Final License Application Download
Final License Application Exhibit H 04/29/2016 Final License Application Download
Final License Application Exhibit D 04/29/2016 Final License Application Download
Final License Application Exhibit B 04/29/2016 Final License Application Download
Final License Application Cover Letter 04/29/2016 Final License Application Download
Responses to Connecticut River Watershed Council comment letter dated March 25, 2016 and Mr. Karl Meyer comment letter dated March 27, 2016 04/22/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
March 16, 2016, Study Meeting Summary. 03/31/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight- March 16, 2016 Study Report Meeting 03/14/2016 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Presentation. 03/08/2016 Fish and Aquatics Download
FirstLight - March 8, 2016 Study 3.3.2 Adult Shad Telemetry Data Analysis Meeting. Memorandum. 03/08/2016 Fish and Aquatics Download
Relicensing Study 3.2.1 Water Quality Monitoring Study 03/01/2016 Water Resources Download
Relicensing Study 3.3.12 Evaluation of Emergency Gate and Bypass Flume Discharges 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.11 Fish Assemblage Assessment 03/01/2016 Fish and Aquatics Download
Relicensing Study 3.3.6 Impact of Project Operations on Shad Spawning, Spawning Habitat and Egg Deposition in the area of the Northfield Mountain and Turners Falls Projects 03/01/2016 Fish and Aquatics Download