Licensing Documents

Filter

Document Title Date of Filing Contents Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 2 IFIM Study for Mussels in Reach 5 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.15 Assessment of Sea Lamprey Spawning within Assessment of Sea Lamprey Spawning within Turners Falls Turners Falls Project Northfield Mountain Project Area Addendum 1 Impact on Sea Lamprey Spawning Nests near Stebbins Island 05/01/2018 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and below Cabot Station Addendum 3 Assessment of Yellow Lampmussels in Reach 3 05/01/2018 Fish and Aquatics Download
FirstLight Submittal of RMC 1994 Report 04/19/2018 Fish and Aquatics Download
FirstLight Response to Stakeholder Comments on Study Plan 3.3.19 04/13/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (Harza_RMC_1993) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1994) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (Harza_RMC_1992) 04/06/2018 Fish and Aquatics Download
FirstLight Response to FERC’s March 13, 2018 letter regarding Downstream Juvenile Shad Study No. 3.3.3 (RMC_1995) 04/06/2018 Fish and Aquatics Download
FirstLight files record of MADFW correspondence supporting the delay on conducting the Juvenile Shad Study Report 3.3.3 02/28/2018 Fish and Aquatics Download
FirstLight Update to FERC on Study Report 3.7.1 02/26/2018 Cultural Download
FirstLight Update to FERC Outstanding Addendums, Additional Proposed Studies and Proposed Schedule 02/23/2018 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight cover letter filing 2017 Relicensing Study 3.3.1 IFIM for Reach 5 Mussels 08/23/2017 Fish and Aquatics Download
Relicensing Study 3.3.1 Conduct Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station - IFIM for Mussels 2017 08/01/2017 Fish and Aquatics Download
FirstLight files Response to Stakeholder Requests for Study Modifications and/or New Studies Based on the Study Report 05/30/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight files status of additional data required for Relicensing Studies No. 3.3.1 and 3.3.15 by FERC's February 17, 2017 Study Plan Determination Letter 05/11/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Cover Letter for filing 2017 Study Report 3.3.2, 3.3.3 Addendums and 3.3.1 Errata 05/01/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
​Errata Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2 Errata) 05/01/2017 Fish and Aquatics Download
Relicensing Study 3.3.2 Evaluate Upstream and Downstream Passage Addendum 1 05/01/2017 Fish and Aquatics Download
Relicensing Study 3.3.3 Evaluate Downstream Pass Evaluate Downstream Pass Evaluate Downstream Passage Addendum 1 05/01/2017 Fish and Aquatics Download
FirstLight Transmittal Letter FERC filing 2017 Study Reports 3.1.2 (re-issue), 3.3.1 Addendum 1, 3.5.1 Addendum 2 04/03/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight response Massachusetts Department of Environmental Protection (MADEP) comments on the Erosion Causation Report letter dated December 14, 2016 04/03/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight analysis of expanded use of the Upper Reservoir on potential shoreline erosion of the Turners Falls Impoundment 04/03/2017 Operations Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D2) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) Appendix J-II 04/01/2017 Geology and Soils Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D4) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume III (Re-Issue 2017) 04/01/2017 Geology and Soils Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version (Attachment) 04/01/2017 Wetlands Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume II (Re-Issue 2017) 04/01/2017 Geology and Soils Download
Relicensing Study 3.1.2 Northfield Mountain / Turners Falls Operations Impact on Existing Erosion and Potential Bank Instability Study Report Volume I (2017) 04/01/2017 Geology and Soils Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D5) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D1) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D3) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E2) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D7) 04/01/2017 Fish and Aquatics Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment D6) 04/01/2017 Fish and Aquatics Download
Relicensing Study 3.5.1 Baseline Inventory of Wetland, Riparian and Littoral Habitat in the Turners Falls Impoundment and Assessment of Operational Impacts on Special Status Species Addendum 2 - Public Version 04/01/2017 Wetlands Download
Relicensing Study Report 3.3.1 Instream Flow Habitat Assessments in the Bypass Reach and Below Cabot Station Addendum 1 (Attachment E1) 04/01/2017 Fish and Aquatics Download
FirstLight Study Report Meeting Summary (March 16, 2017) 03/31/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Presentation for Study Report Meeting March 16, 2017 03/16/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight Response to the January 15, 2017 letter from the Narragansett Indian Tribe (NIT) regarding Traditional Cultural Properties Study 03/01/2017 Cultural Download
Transmittal Letter Filing of Study Reports 3.3.5, 3.3.19, 3.8.1 and Agenda for Study Report Meeting, March 16, 2017 03/01/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
Relicensing Study 3.3.19 Evaluate the use of Ultrasound Array to Facilitate Upstream Movement to Turners Falls Dam by Avoiding Cabot Station Tailrace 03/01/2017 Fish and Aquatics Download
Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operations on Flow, Water Elevation and Hydropower Generation 03/01/2017 Operations Download
Relicensing Study 3.3.5 Evaluate Downstream Passage of American Eel 03/01/2017 Fish and Aquatics Download
FirstLight Response to the January 17, 2017 letter from the Elnu Abenaki Tribe regarding Traditional Cultural Properties Study 03/01/2017 Cultural Download
FirstLight Notification of Updated Study Report Meeting March 1, 2017 02/23/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download
FirstLight letter to FERC requesting filing date extension until April 3, 2017 for Study No. 3.1.2 Addendum 02/22/2017 FERC Scoping/Integrated Licensing Process (ILP) Process Download