Licensing Documents
Filter
Document Title | Date of Filing | Contents | Download |
---|---|---|---|
Analysis of Erosion in Vicinity of Route 10 Bridge Spanning the Connecticut River prepared by Simons & Associates (2012). | 01/08/2013 | Geology and Soils | Download |
Freshwater Mussel Survey in the Connecticut River for the Turners Falls and Northfield Mountain Hydroelectric Projects prepared by Biodrawversity (2012) | 01/08/2013 | Fish and Aquatics | Download |
Riverbank Erosion Comparison along the Connecticut River prepared by Simons & Associates (2012) | 01/08/2013 | Geology and Soils | Download |
Scoping Document 1 for TransCanada Hydro Northeast Inc. (Wilder Project, Bellows Falls, Vernon Project) and FirstLight (Turner Falls, Northfield Mountain) | 12/21/2012 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
Modification to Integrated Licensing Process Schedule | 12/21/2012 | FERC Scoping/Integrated Licensing Process (ILP) Process | Download |
Pre-Application Document (PAD) For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) | 10/30/2012 | Pre-Application Document | Download |
Notification of Intent (NOI) of Firstlight Hydro Generation Company to File an Application for A New License For The Turners Falls Hydroelectric Project (No. 1889) and the Northfield Mountain Pumped Storage Project (No. 2485) | 10/30/2012 | Notice of Intent | Download |
Field, John. 2011. Detailed Analysis of the 2008 Full River Reconnaissance of the Turners Falls Pool on the Connecticut River: Unpublished report prepared for The Landowners and Concerned Citizens for License Compliance. | 01/01/2011 | Geology and Soils | Download |
Field Geology Services. (2007). Fluvial geomorphology study of the Turners Falls Pool on the Connecticut River between Turners Falls, MA and Vernon, VT. Prepared for Northfield Mountain Pumped Storage Project. Farmington, ME: Field Geology Services. | 01/01/2007 | Geology and Soils | Download |
US Army Corps of Engineers (USACE). 1991. General investigation study - Connecticut River streambank erosion. Waltham, MA: USACE, New England Division. | 01/01/1991 | Geology and Soils | Download |
Northrop, Devine and Tarbell, Inc.. 1991. Connecticut River Riverbank Management Master Plan (Draft). Northeast Utilities Service Company, Inc. | 01/01/1991 | Geology and Soils | Download |
Simons, D.B., Andrew, J.W., Li, R.M., & Alawady, M.A. (1979). Connecticut River Streambank Erosion Study: Massachusetts, New Hampshire, and Vermont. Waltham, MA: US Army Corps of Engineers (USACE). | 01/01/1979 | Geology and Soils | Download |